PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing South (800x600).jpg Installing the underground piping at Men's Room 133 Facing North (800x600).jpg Installing the underground piping at the Locker Room 133 Facing North (800x600).jpg Rebar mats at Stair -4 (4th Floor) Facing North  (800x600).jpg Underground plumbing between column lines 3-3.5 from C-E. Facing West (800x600).jpg
Previous page Underground plumbing between column lines 3-3.5 from C-E. Facing West (800x600)
Underground plumbing between column lines 3-3.5 from C-E. Facing West (800x600)